gepic

Rear basement excavation and extension erection

Application approved in Hackney: Excavation of the rear basement.

Erection of a 2-storey rear extension at the basement and ground floor levels.

Access grate, 1.8m high privacy screens, installation of railings over the front lightwell.

About this project

Basement Floor

Before
After

Ground Floor

Before
After

Add a Comment

Your email address will not be published. Required fields are marked *